Have a Question ?
Ask about our products, services, or latest research. Let's discuss how we can help you solve your problem.
Send Message Box
Send Message Icon

Autodesk BIM 360 to Autodesk Forma Migration

We enable automation-based BIM 360 to Autodesk Forma and Forma to Forma cross-instance migration solution using the Autodesk Platform Services (APS) APIs and its proprietary migration toolkit to provide secure, high-speed, and auditable data transfer with zero downtime.

With Autodesk integrating all functionality into a single platform, the AEC industry is rapidly transitioning from Autodesk BIM 360 to Autodesk Forma. Also, there is a requirement of project migration from one Forma hub or subscription to another as there is a ownership change from one region to another. Project migration involves massive amounts of Revit, Navisworks, Plant 3D, and IFC data, extensive version history, intricate metadata and permission structures, tight downtime constraints, and regional data sovereignty.

Our Services and Offerings Includes :

Autodesk BIM 360 to Autodesk Forma Migration

A transition is required for organizations to run active projects on Autodesk BIM 360 without losing historical data, versions, or permissions. Exports and re-upload processes may cause data inconsistencies, downtime, and broken project workflows.

Our offering include:
Complete project structure migration as defined in BIM 360, ensuring continuity in Forma.
High-speed file and version transfer are done using optimized APS API workflows, avoiding data flattening.
Large model handling including heavy data on Revit, Navisworks, Plant 3D, and IFC files without performance degradation.
Metadata and attribute preservation are done to map and validate project metadata in Forma to maintain downstream workflows.
BIM 360 to Forma Migration
Autodesk Forma Cross-Instance Migration

Forma to Forma Cross-Instance Migration

The project data has to be transferred between the contractor and the owner’s Forma subscriptions in cases of project handover or organizational changes. The differences in user roles, companies, and permission structures make it difficult to transfer data directly.

Our offerings include:
Cross-subscription project migration to secure migration between different Forma instances.
Project users, organizations, and role definitions are re-associated accurately in the target Forma environment.
Folder-level access controls are re-applied based on target subscription governance rules.
Selective migration capability is migrated independently, reducing volume and execution time.
Autodesk Forma Cross-Region Migration

Cross-Region Hub Migration

Global projects must support regional requirements for data residency. Standard migration tools are not effective in terms of performance, latency, and regional scheduling constraints.

Our offerings include
Region-aware migration workflows across Autodesk regional hubs while respecting hosting constraints.
API throughput optimization to maximize transfer rates across regions.
Downtime-minimized execution for migration windows planned outside working hours to avoid disruption to live projects.
Autodesk Forma Cross-Region Migration
BIM 360 Migration toolkit

Automation-based Migration Toolkit

Manual or generic migration tools will not be effective in a large BIM environment with thousands of files and complex versions of histories. There is a lack of control over selective migration of certain data types.

Our offerings include:
Modular migration toolkit to migrate files, versions, metadata, users, permissions through configurable modules.
High-performance automation engine built using Autodesk Platform Services APIs to deliver faster and reliable migrations.
Enterprise-ready scalability for single projects as well as multi-project.
BIM 360 to Forma Migration toolkit
Why Choose Autodesk BIM 360 & Construction Cloud Migration Services by CCTech
Cross-Hub and Cross-Region Migration Capability
We facilitate a secure transfer of project data from one Autodesk hub to another or from one geographical region to another, including US, EU, and APAC regions.
Built for Long-Term Infrastructure Project Lifecycles
Infrastructure projects may take a long time and involve several migrations. We facilitate migrations that are driven by the lifecycle of projects.
Zero Disruption to Live Project Execution
The migration process is planned in such a way that there is no disruption to the live project execution.
Optimized for Tight Migration Windows
The migration process is optimized to be executed within a tight time window to avoid business disruption.
Secure Transfer of Project Ownership Between Forma Subscriptions
The migration process ensures a secure transfer of project ownership between the contractor and Autodesk Forma subscriptions, which maintains the integrity of the data.